‘Worst possible timing!’ Simon Calder slams ‘another failure’ in British trains after eyewatering HS2 cost increase revealed
المصدر: GB News | Source: GB NewsSimon Calder has slammed “another failure” blighting Britain’s trains today as the eyewatering cost of HS2 was revealed.
The travel journalist said disruption, caused by a signalling problem which subsequently affected the rail network across the UK, “could not have come at a worse time” for the Transport Secretary, Heidi Alexander.
“This is yet another failure of the GSMR, our communications network,” Mr Calder told GB News.
“This is a sophisticated link between signalers and train drivers, and it's absolutely not the first time that it has gone down.”
He explained that the disruption came at a particularly embarrassing moment for the Government, as the Transport Secretary issued an update on the long-stalled high-speed railway project.
Addressing MPs in the House of Commons, Ms Alexander revealed that the cost of the HS2 project could rise to £102.7billion and may not open until 2039.
WATCH THE CLIP ABOVE
Our Standards: The GB News Editorial Charter
ملاحظة تحريرية | Editorial Note: نُشر هذا المقال في الأصل بواسطة GB News. خبر (Khabr) هي منصة إعلامية أردنية مرخّصة تعمل بالذكاء الاصطناعي. نضيف قيمة تحريرية من خلال: تحليل ذكي للأخبار، ملخصات تلقائية، رواية صوتية بالذكاء الاصطناعي، ترجمة متعددة اللغات، وتدقيق الحقائق. هدفنا جعل الأخبار أكثر وضوحاً وسهولةً للقارئ العربي.
This article was originally published by GB News. Khabr is a licensed Jordanian AI-powered news platform (Registration #82086). We add editorial value through: AI-powered news analysis, automated summaries, AI audio narration, multi-language translation (Arabic, English, French, Turkish), and AI fact-checking. Our mission is to make news more accessible and understandable for Arabic-speaking audiences worldwide.





