🕐 --:--
-- --
عاجل
⚡ عاجل: كريستيانو رونالدو يُتوّج كأفضل لاعب كرة قدم في العالم ⚡ أخبار عاجلة تتابعونها لحظة بلحظة على خبر ⚡ تابعوا آخر المستجدات والأحداث من حول العالم
⌘K
AI مباشر | -- مشاهد مباشر
861,054 مقال 404 مصدر نشط 228 قناة مباشرة 5,625 خبر اليوم
آخر تحديث: منذ ثانية

Karachi's K-IV water project in focus as Sindh CM meets World Bank official

أخبار محلية
Dawn
2026/05/29 - 10:22 509 مشاهدة
تحليل ذكي | AI Editorial Analysis
جاري تحليل المقال...

Sindh Chief Minister Murad Ali Shah on Friday met with World Bank Country Director Bolorma Amgaabazar to review progress on Karachi’s water supply, infrastructure development projects, and the K-IV augmentation scheme.

According to a press release issued by the Chief Minister House, Murad said the Sindh government, with the World Bank’s support, aims to establish a “modern and sustainable water supply system for Karachi”.

He added that the K-IV project is vital for meeting the city’s future water requirements.

CM Murad directed the authorities concerned to “remove all technical and administrative hurdles in the K-IV project and ensure its timely completion”.

He emphasised that effective water management and transparent governance were essential in view of Karachi’s rapidly growing population.

During the meeting, the chief minister and the World Bank country director also discussed water metering, urban improvement works in informal settlements, and ongoing reforms in the Karachi Water & Sewerage Corporation (KWSC).

Provincial ministers Nasir Shah and Jam Khan Shoro, Mayor Karachi Murtaza Wahab, senior government officials, and World Bank representatives attended the meeting.

Earlier, the chief minister had directed authorities to ensure that work on the project continues at an accelerated pace while carefully managing construction activity in densely populated areas with existing utility lines.

“Karachi’s expanding population requires a modern and efficient water supply system. We must ensure that all ongoing projects are completed on time and to the highest quality standards,” he said.

Originally launched in the early 2000s to address Karachi’s chronic water shortage, the K-IV project has faced multiple revisions, cost escalations, and bureaucratic delays over the years. Despite renewed federal attention in recent years, concerns have persisted over funding and implementation timelines.

The project — designed to provide a sustainable supply of 650 million gallons per day (MGD) to Karachi in three phases — is being jointly executed by the Sindh and federal governments. The Water and Power Development Authority (Wapda) is currently implementing Phase I, which aims to supply 260 MGD to the city.

The project faced another setback last year when the federal government allocated only Rs3.2 billion in the budget against the required amount of Rs40bn for the scheme.

In February, Planning Minister Ahsan Iqbal set December 2026 as the new deadline for the project’s completion and directed the authorities to expedite work on it.

المصدر: Dawn | Source: Dawn

ملاحظة تحريرية | Editorial Note: نُشر هذا المقال في الأصل بواسطة Dawn. خبر (Khabr) هي منصة إعلامية أردنية مرخّصة تعمل بالذكاء الاصطناعي. نضيف قيمة تحريرية من خلال: تحليل ذكي للأخبار، ملخصات تلقائية، رواية صوتية بالذكاء الاصطناعي، ترجمة متعددة اللغات، وتدقيق الحقائق. هدفنا جعل الأخبار أكثر وضوحاً وسهولةً للقارئ العربي.

This article was originally published by Dawn. Khabr is a licensed Jordanian AI-powered news platform (Registration #82086). We add editorial value through: AI-powered news analysis, automated summaries, AI audio narration, multi-language translation (Arabic, English, French, Turkish), and AI fact-checking. Our mission is to make news more accessible and understandable for Arabic-speaking audiences worldwide.

مشاركة:

المزيد عن أخبار محلية | More on Local News

هذا الخبر ضمن تغطية خبر لقسم أخبار محلية. نقدّم لك تحليلات ذكية وملخصات يومية لأهم الأخبار من مصادر موثوقة متعددة. المصدر: Dawn. يوجد 6 مقالات مرتبطة بهذا الموضوع.

This article is part of Khabr's coverage of Local News. We provide AI-powered analysis, summaries, and multi-source aggregation to keep you informed. Source: Dawn. Tags: Karachi, water project, World Bank.

مقالات ذات صلة

AI
يا هلا! اسألني أي شي 🎤
FREE Free 1GB Internet + Free International Calls

$1 trial — eSIM in 190+ countries — No roaming charges

Download Free
🔍