Bangladesh Enters Nuclear Era As 2,400-MW Power Plant Begins Fuel Loading
✨ AI Summary
🔊 جاري الاستماع
Rooppur is equipped with two VVER-1200 reactors, each with a capacity of 1,200 megawatts, giving the plant a combined output of 2,400 megawatts.





